Warehouse racking and AS/RS project case studies
Project Evidence · Since 1997

Warehouse Racking & AS/RS Project Case Studies

Technical snapshots, engineering decisions and measurable outcomes from complex storage projects delivered for industrial buyers worldwide.

Home / Project Case Studies
Evidence Before Commitment

Use Project Data to Evaluate Fit, Safety and Total Cost

For procurement teams, a project reference is only useful when it answers practical questions: what load, what height, what throughput, which equipment, and how was the system verified? The case snapshots below summarise engineering parameters from projects delivered by My Favorite Shelf Industrial Co., Ltd. Client names are omitted where confidentiality applies; system data and application logic remain representative.

Projects are reviewed against applicable racking design codes, local seismic requirements where relevant, fire and life-safety coordination, and the buyer's operating model. Documentation can include layout drawings, load calculations, material certificates, coating reports, FAT/SAT records and O&M manuals.

Images are representative of the listed system types. Final project configuration, safety assessment and approvals always depend on site conditions, local code review and operating data.

8,000+
Projects delivered
140+
Export countries
60,000t
Annual steel capacity
70+
Patents and software rights
Representative Project Portfolio

Case Studies by Application

Compare system type, storage height, unit load, capacity, equipment scope and outcome. Each project is a reference for engineering logic, not a copy-and-paste product package.

High-bay chemical AS/RS with automated pallet conveying Chemical

High-Bay Chemical AS/RS with Pallet Conveying

Fully automated high-bay storage for bagged and drummed chemical products, designed to remove forklift traffic from the storage zone and protect inventory from contamination.

  • Storage height21 m
  • Unit load1,000 kg/pallet
  • Pallet positions11,244
  • Stacker cranes6 sets
  • Conveying2 lifts, 2 RGVs, 4 packaging lines
  • Control / yearWMS · 2021

Engineering focus: high-bay stability, controlled product flow and tight WMS integration for inbound and outbound batches.

Integrated logistics AS/RS with high-bay storage and conveyors Integrated Logistics

Integrated Logistics AS/RS with 50,244 Pallet Positions

A large-scale automated distribution centre combining high-bay storage, conveyors and transfer equipment for high-volume logistics operations.

  • Storage height22.7 m
  • Unit load1,000 kg
  • Pallet positions50,244
  • Stacker cranes14 sets
  • Conveying85 roller conveyors, 28 trolleys, 20 transfers
  • Project year2006

What it proves: capability to deliver large equipment fleets, interface management and phased commissioning for logistics hubs.

Pharmaceutical high-bay AS/RS with stacker cranes Pharmaceutical

Pharmaceutical High-Bay AS/RS

GMP-conscious automated storage for pharmaceutical production, using 24 m racking and 1,500 kg pallet loads to support traceable batch movement.

  • Storage height24 m
  • Unit load1,500 kg
  • Pallet positions14,740
  • Stacker cranes9 sets
  • Conveying2 conveyor systems
  • Project year2018

Engineering focus: clean operation, accurate WMS traceability, redundant material flow and controlled access.

Textile finished-goods automated warehouse with racking Textile

Textile Finished-Goods AS/RS

An automated warehouse for textile products that reduces manual handling and improves finished-goods rotation.

  • Storage height19 m
  • Unit load600 kg
  • Pallet positions6,820
  • Stacker cranes5 sets
  • Conveying4 chain conveyor sets
  • Project year2024

Outcome fit: supports multi-SKU storage with scalable automation and stable throughput during seasonal peaks.

Multi-tier e-commerce mezzanine warehouse with four levels E-commerce

25,000 m² Multi-Tier E-commerce Mezzanine

A four-level mezzanine structure for e-commerce picking and storage, using 5,800 t of steel to expand usable area without a new building footprint.

  • Floor area25,000 m²
  • Height / levels12 m / 4 deck levels
  • Steel weight5,800 t
  • SystemMulti-tier mezzanine
  • LocationGuangzhou
  • Project year2014

What it proves: high-volume structural design, fire-route coordination and fast order-picking workflows for e-commerce operations.

Mini-load multi-shuttle AS/RS for automation components Machinery

Mini-Load Multi-Shuttle System for Automation Components

A high-density bin storage and retrieval system for small automation parts, integrated with WCS/WMS and a conveyor interface.

  • Storage height16 m
  • Unit load30 kg
  • Storage positions9,860 bins
  • Multi-shuttles4 sets
  • ControlWCS + WMS
  • Project year2021

Engineering focus: precise bin handling, order sequencing and inventory accuracy for high-value components.

Four-way shuttle warehouse for new energy materials New Energy

Four-Way Shuttle Warehouse for New Materials

A dense pallet storage system using four-way shuttles to maximise capacity within a compact building envelope.

  • Storage height11 m
  • Unit load1,000 kg
  • Pallet positions1,194
  • Four-way shuttles2 sets
  • ControlSiemens fieldbus
  • Project year2018

What it proves: dense storage, flexible lane allocation and reduced aisle space for new-energy material producers.

Food cold-storage AS/RS with high-bay racking Cold Storage

24 m Food Cold-Storage AS/RS

High-bay automated cold storage for temperature-controlled food products, designed for reliability in continuous low-temperature operation.

  • Storage height24 m
  • Unit load700 kg
  • Pallet positions18,240
  • Stacker cranes5 sets
  • Conveying9 conveyor systems
  • Project year2016

What it proves: cold-store equipment protection, condensation control and stable runtime in a high-humidity environment.

Paper roll AS/RS with heavy-duty stacker cranes Paper Industry

Paper Roll AS/RS with 42,432 Positions

Automated handling for heavy paper rolls and finished paper products, linking production output to dispatch with minimal manual intervention.

  • Storage height23 m
  • Unit load1,750 kg/roll
  • Storage positions42,432
  • Stacker cranes16 sets
  • ConveyingPlate-chain system
  • ControlSiemens WCS + WMS

What it proves: heavy-load automation, production-to-warehouse integration and large-scale WMS/WCS controls.

Food manufacturing shuttle warehouse with stacker crane Food Manufacturing

Food Manufacturing Shuttle Warehouse

A compact hybrid storage solution using a stacker crane and two-way shuttles for fast-moving food products.

  • Storage height10.5 m
  • Unit load1,000 kg
  • Pallet positions2,806
  • Stacker cranes1 set
  • Two-way shuttles3 sets
  • Project year2020

Outcome fit: balances dense storage with selective access for batch-managed food production.

Project Snapshot Matrix

Compare Technical Data

A concise comparison of representative projects. Use these figures to frame your own requirement, then request a layout and load calculation for your building.

Representative warehouse racking and AS/RS project data
Application System type Height Unit load Capacity Key equipment Year / region
ChemicalHigh-bay AS/RS21 m1,000 kg/pallet11,244 pallets6 stacker cranes, 2 lifts, 2 RGVs, 4 packaging lines2021 / East China
Integrated logisticsAS/RS distribution centre22.7 m1,000 kg50,244 pallets14 stacker cranes, 85 roller conveyors, 28 trolleys2006 / Dalian
PharmaceuticalHigh-bay AS/RS24 m1,500 kg14,740 pallets9 stacker cranes, 2 conveyor systems2018 / Suihua
TextileFinished-goods AS/RS19 m600 kg6,820 pallets5 stacker cranes, 4 chain conveyors2024 / Nanjing
E-commerceMulti-tier mezzanine12 m / 4 levelsPicking and storage loads25,000 m² floor area5,800 t steel structure2014 / Guangzhou
MachineryMini-load multi-shuttle16 m30 kg9,860 bins4 multi-shuttles, WCS + WMS2021 / Ningbo
New energyFour-way shuttle11 m1,000 kg1,194 pallets2 four-way shuttles, Siemens fieldbus2018 / Jinhua
Cold storageFood AS/RS24 m700 kg18,240 pallets5 stacker cranes, 9 conveyors2016 / Thailand
PaperHeavy-load AS/RS23 m1,750 kg/roll42,432 positions16 stacker cranes, plate-chain conveyors, WCS/WMS2013 / Chongqing
Food manufacturingStacker crane + two-way shuttle10.5 m1,000 kg2,806 pallets1 stacker crane, 3 two-way shuttles2020 / Chongqing

Project data is provided for feasibility comparison. Final design depends on building geometry, fire strategy, local code, pallet condition, throughput and operator procedures.

From Reference to Buildable Design

Our Project Delivery Process

A disciplined workflow turns operating data into a safe, verifiable and installable storage system.

Operational Survey

Building dimensions, pallet profiles, SKU velocity, throughput, temperature and fire strategy are confirmed before layout work.

Code & Load Review

Structural, seismic and local code requirements are reviewed, with calculations prepared for the buyer's engineer where required.

Design & Simulation

CAD layouts, rack configuration and equipment selection are validated against storage density and order-flow targets.

Manufacturing & QA

Steel traceability, dimensional checks, coating verification, load testing and FAT procedures are controlled before shipment.

Install & Handover

Site supervision, commissioning, operator training, O&M manuals and spare-parts guidance support long-term operation.

Verification Package

What Overseas Buyers Can Verify

Trust is built on documents, not slogans. The following records can be arranged before shipment or during project handover, subject to project scope and confidentiality.

Design basis and calculations

Layout drawings, load assumptions, structural calculations and seismic review packages where applicable.

Material and coating records

Steel certificates, coil traceability, inspection records and coating-thickness checks.

Load and functional testing

Rack load test records and FAT procedures for cranes, shuttles, conveyors and control interfaces.

Customs and shipping documents

Commercial invoice, detailed packing list, certificate of origin and bill of lading support.

Installation and O&M manuals

Assembly drawings, commissioning checklists, operation manuals and maintenance schedules.

Certification scope

ISO 9001, ISO 14001, ISO 45001 and CE documentation for applicable equipment categories.

Quality & Compliance Evidence

Third-party certifications that procurement, engineering and safety teams can review against the proposed equipment scope.

CE certificate for storage racking
CE · Racking
ISO 9001 quality management certificate
ISO 9001
CE certificate for radio shuttle car
CE · Shuttle Car
CE certificate for AS/RS stacker crane
CE · Stacker Crane
CE certificate for four-way shuttle
CE · Four-Way Shuttle
CE certificate for RGV rail guided vehicle
CE · RGV
ISO 45001 occupational health and safety certificate
ISO 45001
ISO 14001 environmental management certificate
ISO 14001
Buyer Questions

Frequently Asked Questions

We can provide anonymised project summaries with storage height, unit load, pallet positions, equipment quantities, control architecture, project year and region. For qualified buyers, design basis, layout drawings and testing records can be shared under NDA. Confidential client names are not disclosed.

Our engineers prepare structural and seismic calculations referencing applicable local requirements such as NCh 2369 in Chile, E.030 in Peru and NSR-10 in Colombia, together with international racking practice. Calculations, base-plate and anchor schedules are issued with approval drawings for review by the buyer's local engineer.

Yes. We select powder coating systems, pretreatment, hot-dip galvanizing where appropriate, and equipment protection levels for the actual operating environment. Project experience includes 24 m cold-storage AS/RS with 700 kg pallets and paper roll systems handling 1,750 kg rolls.

Material certificates, coil traceability, coating-thickness checks, dimensional inspection reports, load test records, packing lists, certificate of origin and operation and maintenance manuals can be provided. FAT procedures are agreed before production for automated systems.

We provide project-specific installation drawings, site supervision by engineers, commissioning support, operator training and spare parts recommendations. Automated systems include WMS/WCS interface testing and remote troubleshooting support.

Next Step

Discuss a Similar Project with My Favorite Shelf Industrial Co., Ltd.

Share your building size, pallet load, SKU profile and target throughput. Our engineers will prepare a layout and system recommendation based on comparable project experience.

Email: [email protected]

Send an Inquiry
Download Catalog