Are you a factory or a trading company?
We are a manufacturer with our own production base, cold-rolling lines and powder-coating lines, founded in 1997 and processing around 60,000 tonnes of steel per year. Trading companies can quote similar prices, but they cannot control section tolerance, coating thickness or the loading diagram — the three variables that decide whether your container arrives intact and your bays assemble cleanly.
What load can one level and one pallet position carry?
Typical export configurations range from 500 kg per arm on cantilever units up to 4,500 kg per level on heavy-duty selective racking, with the four-level factory model rated at 3,000 kg per level. Capacity is always confirmed against your pallet footprint, load height and handling equipment — a rated figure without a deflection limit is not a usable specification.
Can the racking be designed for seismic zones such as Chile, Peru or Colombia?
Yes. Our engineers prepare structural and seismic calculations with reference to local requirements including NCh 2369 in Chile, E.030 in Peru and NSR-10 in Colombia, and specify reinforced uprights, additional bracing, base plates and anchor schedules accordingly. The calculation report is delivered with the quotation drawings so your local engineer can review and stamp it.
How many pallet positions fit in one 40HQ container?
That depends entirely on the bay configuration, upright height and beam length. As a working rule, nested uprights plus strapped beam bundles allow substantially more shipped capacity than loose packing, and we issue a loading diagram with the quotation so you can compare suppliers on freight per pallet position rather than on price per tonne.
What is the lead time for a standard wholesale order?
Standard selective racking is typically produced in 25 to 35 days after drawing approval. Ocean transit from China to ports such as Santos, Paranaguá, San Antonio, Callao, Buenaventura, Cartagena, Guayaquil or Buenos Aires usually takes 30 to 45 days depending on the service and routing. Project orders that include engineering calculations are scheduled at contract stage.
Which export documents do you provide for customs clearance?
Commercial invoice, detailed packing list, bill of lading and certificate of origin are provided as standard. On request we also supply mill material certificates, coating thickness records, load test reports and installation manuals, with Spanish or Portuguese versions available for project documentation.
Do you provide installation supervision and after-sales service?
Yes. Supervising engineers can be dispatched for installation and commissioning, local installation teams can be trained on site, and spare parts are supplied from stock. For automated equipment such as stacker cranes, shuttles and WMS/WCS software, remote diagnostics are available to shorten downtime.
What finish is recommended for humid or coastal warehouses?
For humid tropical or coastal sites we recommend epoxy-polyester powder coating with enhanced pretreatment. For cold storage, port environments or high-corrosion applications, hot-dip galvanized components are the more durable option. The finish grade should be specified in the purchase order, because “powder coated” on its own does not define a corrosion class.
Can I order a sample or a trial order before committing to a container?
Trial orders are common with first-time distributors and are quoted as a reduced bay set rather than a single shelf, so the assembly sequence can be tested before a full container is committed. Share your pallet dimensions and the trial order can be configured to match the final project exactly.
What is the minimum order quantity and payment term?
Minimum order quantity depends on the product family: a mixed container can accommodate several rack models, while engineered multi-tier systems are quoted per project. Payment terms are agreed at quotation and typically follow a deposit-plus-balance structure against shipping documents. Full terms are confirmed in writing before production begins.